Technical-economic feasibility study for the installation of a hydro generator for commercial vehicles

The study analyzes the installation of a green hydrogen production plant to supply light and heavy vehicles of a private company. The energy to feed the PEM electrolyser from 500 kW comes from a 560 kW photovoltaic plant. The installation has medium-sized compressors and high pressure (500-900 bar), storage in blocks of 200 bar with […]
Technical-economic feasibility study for the substitution of natural gas for hydrogen in industry

This study evaluates the installation of a 2 MW type photovoltaic plant to feed a 1 MW electrolyzer that produces hydrogen for injection in a boiler mixed with natural gas, at in order to reduce CO2 emissions and dependence on natural gas.
Technical-economic feasibility study for the installation of a green hydrogen production plant powered by renewable energy in the south of Spain

The study consists of a 2.4 MW photovoltaic installation to feed a 1MW PEM electrolyser. The hydrogen produced is compressed and stored in 200 bar bottle racks.
GREEN FUELS BIOSTATION – EDAR SABADELL

The project consists of the first multiservice biostation in Europe that will dispense electricity coming from the existing photovoltaic and wind farms in the WWTP; compressed natural gas from biogas generated in the digestion of sludge from the WWTP; and green hydrogen produced by electrolysis of water regenerated in the WWTP and electrical energy supplied […]
ENDTOEND PROJECT EXPANSION – JUMPING

Location: Andalusia, Extremadura, Canary Islands, Galicia, Valencia and the Balearic Islands Key Features: Network Sharing Developer: Telecommunications Division Services provided: Design, Implementation, integration and optimization of the access network Date: 2021 Since 2019, Ecointegral has been carrying out the designs of the JUMPING project in Andalusia, the Canary Islands and Extremadura through its collaboration with […]
HYDROLOGICAL / HYDRAULIC STUDY FOR SOLAR PLANT

Location: Villafranca de los Barros (Badajoz) Main characteristics: 40 Ha affected area, land with gentle slopes, alternating roughness between agricultural land and natural vegetation. Hydrography of the Guadiana River Basin District. Services provided: hydrological and hydraulic study of the area for the technical and administrative project of the photovoltaic plant necessary to obtain the administrative […]
CANDELA WIND FARM

Power: 49.5 MW Location: La Mata de los Olmos and Crivillén Main characteristics: 9 wind turbines with a hub height of 120m and a power of 5.5 MW per unit Services provided: Design of road and electrical infrastructure for wind farms, as well as drafting of technical documentation to obtain prior administrative authorization (Autorización Administrativa […]
40 MW photovoltaic plant execution project

Power: 40 MW Location: Seville Main characteristics: 115,000 modules. Services provided: Plant execution project as well as the evacuation line execution project Date: 2020 The project includes the installation of 115,000 monocrystalline silicon modules for the production of electrical energy and 14 3,400 kVA inverters. The plant occupies a total of 100ha surface. The work […]
700 MW IN ARAGONESE WIND FARMS

Power: 700 MW Location: Aragon Main features: 14 wind farms Services provided: Engineering design to obtain prior administrative authorization, environmental impact statement and administrative construction authorization and declaration of public utility. Date: 2021 The 14 projected wind farms have more than 100 wind turbines of up to 5.5 MW of power each. The development of […]
BASE STATIONS IN THE CANARY ISLANDS

No. Works: 182 Place: Canary Islands Company: Multinational telecommunications infrastructure operator Services provided: Engineering and project management Date: 2019-2020 Since 2019, Ecointegral has carried out the engineering and project management of new mobile phone base stations in the Canary Islands for the infrastructure operator. It has also participated in the modification of existing mobile phone […]
END2END VODAFONE PROJECT

No. Works: 3 Place: Province of Gran Canaria and Autonomous City of Ceuta Company: Vodafone Services provided: Turnkey installation Date: 2020 As part of the large Vodafone mobile network deployment project in which Ecointegral has been collaborating for years, the complete turnkey installation of 3 END2END nodes has been carried out. The works have consisted […]
FTTH Network Deployment

Site: Córdoba Main features: FTTH. Services supplied: Pre-layouts, building and vertical layouts, processing of permits, applications for telephone infrastructures, design of the supply network and distribution network, application for and processing of licences and technical support. Date: 2014-2015. In 2014/2015, Ecointegral provided field engineering and technical office engineering for the design and deployment of an […]
Increase in reception on the Madrid-Córdoba-Málaga high-speed train line

Ecointegral participated in the mobile phone reception project for the railway line linking the cities of Madrid, Córdoba and Málaga. The installations corresponded to the new mobile base stations required for the installation of new telecommunications equipment and the deployment of the GSM, LTE and UMTS systems. Civil engineering works were required, with their corresponding […]
PROJECT FOR THE EXECUTION OF THE 220 kV D/C S.E.T. OVERHEAD LINE BAZA 220/400 kV – S.E.T. 30/220 kV LIMIT IN BAZA AND CANILES IN GRANADA

Location: Baza and Caniles (Granada) Main characteristics: 20.7 Km – 220 KV – Double Circuit Year: 2019 The project consisted of the design of the execution of a 220 kV double circuit high voltage overhead line between the 220 kV LIMITE substation and the 220/400 kV BAZA RENEWABLE substation, with a transport capacity of […]
REE – changes to current transformers at 220 kV substation – Algeciras

Design and detailed project for the replacement of line traps with the 220 kV Puerto Real substation according to the technical specifications and standardisation of the operator of the Spanish Electricity Grid. To perform the works, it was necessary to disconnect the position affected by the replacement. Basically, the following works were included: Dismantling of […]
220 kV line from Fuenfresca Substation – REE Valdeconejos

Location: Aliaga (Teruel) Length: 7 km Year: 2012 This project involved the execution of a 220 kV high voltage overhead line for the evacuation of the Fuenfresca Wind Farm, Aliaga (Teruel). The route of the planned high voltage line runs through the village of Aliaga, in the province of Teruel. The single-circuit line was configured […]
220 kV High Voltage Overhead Line – Coín-Mijas

Year: 2007 Line type: 220 kV D/C overhead Owner: Red Eléctrica de España, S.A.The project covered the topography, detailed engineering and documents that would be necessary for the management and processing of the occupation of rights of way for a 220 kV high voltage overhead line between the substations located in the towns of Coín […]
66 kV wind farm substation – El Tesorillo

Site: San Martín del Tesorillo (Cádiz) Developer: Naturgy Date: 2019 Services supplied: Pre-project and conceptual engineering, licence and implementation projects, project management and site supervision Design, engineering, processing and monitoring of works for a 20/66 kV substation for the evacuation of a wind farm in Cádiz via a high voltage overhead line, which arrives from […]
Proyecto Subestación 132 KV – “Serra Do Punago”

132 kV Substation Project – Serra Do Punago Location: Castroverde (Lugo) 132/20 kV Punago Substation Year: 2018 This project consisted of a substation for the evacuation of the Serra do Punago-Vacariza wind farm, in Galicia. Ecointegral, in addition to carrying out the construction engineering of the evacuation substation, performed the analysis and study of alternative […]
Extension of the Los Llanos substation in Casares (Málaga)

For this project, Ecointegral conducted the engineering and design of the extension of the substation in accordance with current legislation, the client’s own regulations and the applicable international standards. Procedures were carried out to obtain the necessary permits for the works and commissioning of the project, continuously monitoring everything and preparing the reports and documents […]
Substation and 220 kV overhead line – Alvarado

Developer: Solarpack Corp. Tecnológica, S.A. Site: Badajoz Main features: Elec. power 70 MW / Voltage: 30/220 kV Date: 2018 The project included the development of the substation project and a 220 kV high voltage line for the evacuation of two solar power plants with a total capacity of 85 MW. The internal MV network connects […]
400 kV high voltage overhead line for evacuation of solar thermal plant

Lugar: San José del Valle (Cádiz) Site: San José del Valle (Cádiz) Type: 400 kV single-circuit high voltage overhead line Year: 2010 Developer: Torresol Energy Investments, SA The project included the design and engineering of a 400 Kv single-circuit line connecting the substation of the 50 MW solar thermal plant and the substation owned by […]
REE. Adaptation of Corralejo substation to 66 kV – Playa Blanca (Fuerteventura)

The project, which was part of REE’s asset upgrade programme, consisted of the detailed engineering of modifications that included civil engineering works, supply works, electromechanical assembly, auxiliary installations, integration of protection systems, and control of new equipment at the substation on the island. This involved the installation of a series of HV equipment (voltage transformers […]
Client Complaints Project (Clarify)

Site: Andalusia, Extremadura. Main features: Customer complaints due to the mobile telephone network. Developer: Telecommunications Division. Services supplied: Customer service via the Clarify tool (AMDOCS). Date: 2015 – 2019. The Telecommunications Department coordinated/solved customer complaints due to the network (reception, poor quality, etc.) of one of the leading mobile telephone operators in its Southern Region […]
Efficient climate control renewal project

Number of climate-controlled offices: 250 Site: Andalusia-Valencia-Murcia Developer: Telefónica Soluciones Services supplied: Design engineering and project management Date: 2017 Renewal of the climate control equipment at 250 banks, taking into account current regulations and carrying out design focused on energy efficiency. The aim of the project was to renew the climate control systems, optimising capacity […]
“Portico” project covering Guadalinfo centres

Number of stations deployed: 193 Site: Andalusia Developer: Vodafone España Services supplied: Design engineering, legal certification and project management Date: 2008 The 193 mobile phone stations belonging to this project were deployed across Andalusia. The aim of the project was to meet technological needs in rural areas, villages with less than 20,000 inhabitants, so-called autonomous […]
Engineering for telecom infrastructure operator centres

Number of actions: 150 Site: Andalusia-Catalonia-Valencia Developer: Axion / Abertis Services supplied: Design engineering, legal certification and project management. Date: 2001-2019 150 actions were carried out at various types of centres, both urban and rural with a tower. Various types of work, such as the engineering, processing and management of the construction of complete centres, […]
FREQUENCY PLAN (SIMULATIONS) Project

Site: Andalusia, Extremadura. Main features: Network access. Developer: Telecommunications Division Services supplied: 2G, 3G and 4G frequency plan. Date: 2017 – 2019 The Telecommunications Department carried out various frequency plans ranging from 2G to 4G for one of the main mobile telephone operators in the southern region (Andalusia and Extremadura). For this project, it used […]
La Victoria Wind Farm

Power: 24 MW Site: Chiclana de la Frontera, Cádiz Main features: Twelve 2 MW turbines – Net production 57,624 GWh/year Developer: NEK Eólica Services supplied: Project implementation Date: 2009 Ecointegral carried out the entire implementation project of the La Victoria wind farm, consisting of twelve Vestas V90/2000 wind turbines with 2 MW of power each, […]
Regular Regulatory Reviews of the Power Distribution Grid in Eastern Andalusia

Thanks to the experience amassed since 2012 as an power distribution engineering company, Ecointegral worked with distribution companies to conduct the legally-stipulated technical monitoring in order to check the operating and safety status of the medium voltage lines and the transformer substations of the utility companies. This RRR (Regular Regulatory Review) project includes the annual […]
End-to-end Project (Jumping)

Site: Andalusia, Extremadura and the Canary Islands. Main features: Network sharing. Developer: Telecommunications Division. Services supplied: Design, implementation, integration and optimisation of the access network. Date: 2019 – 2020. Ibertel (and therefore Ecointegral as a subsidiary of the southern region) was one of the winners of the E2E (turnkey) project for one of the leading […]
Deployment of Fibre Optic Backbone Network

Site: Seville. Main features: Backbone network. Services supplied: Implementation project, applications for telephone infrastructures, application and management of permits, HSC, project management and as-built documents. Date: 2018-2019 Ecointegral participated as the engineering firm for the deployment of a 27-kilometre-plus backbone network in the province of Seville to connect two of its main centres and support […]
Deployment of Fibre Optic Networks

Site: Andalusia, Extremadura and the Canary Islands. Main features: FTTN, FTTC, FTTP, fibre for business customers. Services supplied: Feasibility study (technical and financial), design engineering, field layouts, management of MARCo TESA regulation, implementation projects, project management, health and safety coordination, applications for and processing of licences with public authorities, preparation of splicing diagrams, updating of […]
Energy Audit – La Santa

Ecointegral, en colaboración con Endesa Energía S.A., ha realizado la auditoría energética de uno de los clubes deportivos más Contracted Electrical Capacity: 2.27 MW. Site: Lanzarote, Canary Islands Main features: Consumption 7 GWh/year, 380 employees. Hospitality. Sports centre. Cogeneration. Developer: Club La Santa, S.A. Services supplied: Energy auditing Date: 2016 Ecointegral, in partnership with Endesa […]
Environmental Impact Assessment of the Sierra Sur Wind Power Plan

Environmental impact assessment of a large-scale project, consisting of the joint construction of six wind farms and their transmission infrastructures. In total, the project encompasses forty-two wind turbines, four substations, two load breaking centres, two medium voltage overhead lines and five high voltage overhead lines. All this was on mainly rural land, varying between a […]
Environmental rating and processing of the 12.5-kilometre power distribution line between Almuradiel and Aldeaquemada

Ecointegral prepared the environmental documentation and the environmental rating of the renewal of the medium voltage overhead line with an initial length of 15,044 metres. The new line is shorter (12,400 m) but its voltage was raised to increase its transmission capacity. Taking into account the environmental sensitivity of the surroundings, the configuration of the […]
Broadband reception project in “rural areas without reception” via radio links

The main works were conducted in Villaharta and El Vacar, both rural villages located in the province of Córdoba. Villaharta currently has approximately 700 inhabitants and El Vacar has 130. The operator wanted to provide high-speed data in the most efficient way possible to two of its clients operating in the area, in this case […]
Study into and expansion of 3G and 4G reception at various centres belonging to the Government of Andalusia

The project started with studies into reception, visiting approximately 800 centres spread across Andalusia, mainly in small villages far from urban areas where reception tended to be poor. Healthcare centres, hospitals, schools, large data processing facilities, Plan Infoca forest defence centres, courts, education ministries, government offices, etc. were visited, improving the reception of both 3G […]
Energy Audit – Port of Algeciras

Contracted Electrical Capacitance: 1.3 MW. Site: Algeciras, Cádiz Main features: Consumption 10.3 GWh/year. Port and industrial facilities. Developer: Algeciras Bay Port Authority Services supplied: Energy auditing Date: 2017 Ecointegral carried out the full energy audit of the Port of Algeciras, which is the most important port in Spain in term of freight transport, with annual […]
Alvarado and Sol Alvarado Solar Power Plants

Power: 100 MW Site: Badajoz Main features: 290,000 modules Developer: Solarpack Corp Tecnológica S.A. Services supplied: Economic study, conceptual engineering for electrical installations and substations Date: 2019 This project consists of the design of two solar power plants with identical capacity, located on neighbouring sites so that they can share internal collector networks and a […]
Monclova Solar Power Plant

Power: 40 MW Site: Seville Main features: 147,000 modules / single-axis tracker Developer: Services supplied: Economic study, conceptual engineering for electrical installations and substations Date: 2019 The solar power plant features approximately 2,500 trackers on an N-S axis, which automatically regulate to adjust the east-west tilt of the panels, thereby optimising their energy production at […]
Solar power plant – Shopping centre in Málaga

Power: 2 MW Site: Málaga Main features: 8,707 250 W modules Developer: Ikea Iberica, S.A. Services supplied: Pre-project and conceptual engineering, licence and implementation projects, project management and site supervision Date: 2014 Ecointegral was main engineering company for the Ikea Málaga solar power plant, south of the city. An installation with more than eight thousand […]
El Tesorillo Wind Farm

Located in the village of San Martín del Tesorillo, the wind farm consists of twelve 2.2 MW wind turbines, 110 metres in diameter and with a tower height of 80 metres above ground level, configuring a total capacity of 26 MW. Ecointegral was part of the entire development process of the El Tesorillo wind farm. […]
El Marquesado Wind Farm

Power: 24 MW Site: Puerto Real, Cádiz Main features: Seven 3.43 MW turbines – Net production 87 GWh/year Developer: Viesgo Renovables Services supplied: Pre-project and conceptual engineering, processing and project implementation Date: 2018 Construction began in 2018 on the El Marquesado wind farm, which is located in the town of Puerto Real and has seven […]
Reconfiguration project of low voltage underground lines and relocation of transformer substation in a densely populated urban area

This project is an example of the power distribution works carried out in 2019 and involved relocating and renovating an important transformer substation and its corresponding low voltage lines in a densely populated urban area. Project goals included improving quality, safety and reliability. The plan involved the relocation and extension of a distribution centre consisting […]
ADAPTATION OF EXISTING ELECTRICAL DISTRIBUTION INFRASTRUCTURES TO ROYAL DECREE 337/2014

In the provinces of Málaga and Córdoba, all the documents required by the agencies involved were processed and prepared in 2019 in order to adapt all the medium voltage lines owned by Endesa Distribución in these provinces to Royal Decree 337/2014. It was also necessary to use GIS (Geographic Information System) files to design all […]
Quality assurance plan for remote-controlled transformer substations

Ecointegral carries out projects aimed at improving medium voltage installations within the remote-control plan for transformer substations, owned by Endesa Distribución S.L.U. It designs and outlines the adaptation, refurbishment and renovation works of the medium voltage installations housed in these substations, thereby making it possible to replace the medium voltage cabins where remote-controlled equipment with […]