• Polski
    • Español
    • English
  • FIRMA
    • NASZA FIRMA
    • JAKOŚCI
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • CURRICULUM VITAE
    • OFERTY PRACY
    • ECOTALENT
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
  • NEWS
  • KONTAKT
Logo Logo Logo Logo Logo
  • FIRMA
    • KIM JESTEŚMY
    • JAKOŚĆ
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • DLACZEGO ECOINTEGRAL?
    • CV NADESŁANE
    • OFERTY PRACY
    • Ecotalent
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
    • ODNAWIALNE ŹRÓDŁA ENERGII I EFEKTYWNOŚĆ
    • OPERATORZY TELEKOMUNIKACYJNI
    • DORADZTWO W SPRAWIE OCHRONY ŚRODOWISKA
    • Ogólne odniesienia
  • NEWS
  • KONTAKT
  • Español
  • English
  • Polski
  • FIRMA
    • KIM JESTEŚMY
    • JAKOŚĆ
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • DLACZEGO ECOINTEGRAL?
    • CV NADESŁANE
    • OFERTY PRACY
    • Ecotalent
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
    • ODNAWIALNE ŹRÓDŁA ENERGII I EFEKTYWNOŚĆ
    • OPERATORZY TELEKOMUNIKACYJNI
    • DORADZTWO W SPRAWIE OCHRONY ŚRODOWISKA
    • Ogólne odniesienia
  • NEWS
  • KONTAKT
  • Español
  • English
  • Polski

El Marquesado Wind Farm

Power: 24 MW
Site: Puerto Real, Cádiz
Main features: Seven 3.43 MW turbines – Net production 87 GWh/year
Developer: Viesgo Renovables
Services supplied: Pre-project and conceptual engineering, processing and project implementation
Date: 2018

Construction began in 2018 on the El Marquesado wind farm, which is located in the town of Puerto Real and has seven wind turbines of 132 m in rotor diameter and 163 m in height, with it being commissioned in October 2019.
This project was initially designed with twelve 2 MW turbines but was redesigned and reprocessed to include seven 3.43 MW wind turbines, taking advantage of the upgraded technology and maximising the results of the project. This modification also entailed a reduction in impacts and an improvement in the environmental friendliness of the project by reducing its landscape impact, among others.
Ecointegral participated as main engineering firm in all phases of the development of this wind farm and its auxiliary works (access road and junction with main road, evacuation, etc.): conceptual engineering and pre-design, advice and consulting in resource measurement campaigns, environmental impact studies, processing of permits, the tender project (wind farm, road and substation) and implementation projects.

  • Power: 26 MW
  • Site: San Martín del Tesorillo, Cádiz
  • Main features: 12 turbines - 2,2 MW - Net production, 86 GWh/year
  • Developer: Naturgy Renovables
  • Services Supplied: Previous and conceptual engineering, processing and project implementation
  • Date: 2018
Centrala

Ul. BOHDANA DOBRZANSKIEGO,          nr 3, lok, —, miejsc.
LUBLIN, kod 20-262, poczta LUBLIN, kraj POLSKA   Tl (+34 673 737 750) info@ecointegral.com

Film korporacyjny

Dokumentacja korporacyjna

 
Certyficaty

© 2018 Ecointegral Ingeniería S.L. Legal Terms

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Please enable Strictly Necessary Cookies first so that we can save your preferences!

Additional Cookies

This website uses the following additional cookies:

(List the cookies that you are using on the website here.)

Please enable Strictly Necessary Cookies first so that we can save your preferences!

Cookie Policy

More information about our Cookie Policy