07 May Environmental rating and processing of the 12.5-kilometre power distribution line between Almuradiel and Aldeaquemada
Ecointegral prepared the environmental documentation and the environmental rating of the renewal of the medium voltage overhead line with an initial length of 15,044 metres. The new line is shorter (12,400 m) but its voltage was raised to increase its transmission capacity. Taking into account the environmental...