Power: 700 MW Location: Aragon Main features: 14 wind farms Services provided: Engineering design to obtain prior administrative authorization, environmental impact statement and administrative construction authorization and declaration of public utility. Date: 2021 The 14 projected wind farms have more than 100 wind turbines of up to 5.5 MW of...

Located in the village of San Martín del Tesorillo, the wind farm consists of twelve 2.2 MW wind turbines, 110 metres in diameter and with a tower height of 80 metres above ground level, configuring a total capacity of 26 MW. Ecointegral was part of the...

Power: 24 MW Site: Puerto Real, Cádiz Main features: Seven 3.43 MW turbines - Net production 87 GWh/year Developer: Viesgo Renovables Services supplied: Pre-project and conceptual engineering, processing and project implementation Date: 2018 Construction began in 2018 on the El Marquesado wind farm, which is located in the town of Puerto...

Power: 24 MW Site: Chiclana de la Frontera, Cádiz Main features: Twelve 2 MW turbines - Net production 57,624 GWh/year Developer: NEK Eólica Services supplied: Project implementation Date: 2009 Ecointegral carried out the entire implementation project of the La Victoria wind farm, consisting of twelve Vestas V90/2000 wind turbines with 2...