• Polski
    • Español
    • English
  • FIRMA
    • NASZA FIRMA
    • JAKOŚCI
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • CURRICULUM VITAE
    • OFERTY PRACY
    • ECOTALENT
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
  • NEWS
  • KONTAKT
Logo Logo Logo Logo Logo
  • FIRMA
    • KIM JESTEŚMY
    • JAKOŚĆ
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • DLACZEGO ECOINTEGRAL?
    • CV NADESŁANE
    • OFERTY PRACY
    • Ecotalent
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
    • ODNAWIALNE ŹRÓDŁA ENERGII I EFEKTYWNOŚĆ
    • OPERATORZY TELEKOMUNIKACYJNI
    • DORADZTWO W SPRAWIE OCHRONY ŚRODOWISKA
    • Ogólne odniesienia
  • NEWS
  • KONTAKT
  • Español
  • English
  • Polski
  • FIRMA
    • KIM JESTEŚMY
    • JAKOŚĆ
    • ODPOWIEDZIALNOŚĆ
  • LUDZIE
    • DLACZEGO ECOINTEGRAL?
    • CV NADESŁANE
    • OFERTY PRACY
    • Ecotalent
  • SEKTORY
    • PRZESYŁANIE I DYSTRYBUCJA ENERGII ELEKTRYCZNEJ
    • ODNAWIALNE ŹRÓDŁA ENERGII I EFEKTYWNOŚĆ
    • OPERATORZY TELEKOMUNIKACYJNI
    • DORADZTWO W SPRAWIE OCHRONY ŚRODOWISKA
    • Ogólne odniesienia
  • NEWS
  • KONTAKT
  • Español
  • English
  • Polski

Reconfiguration project of low voltage underground lines and relocation of transformer substation in a densely populated urban area

This project is an example of the power distribution works carried out in 2019 and involved relocating and renovating an important transformer substation and its corresponding low voltage lines in a densely populated urban area.

Project goals included improving quality, safety and reliability.

The plan involved the relocation and extension of a distribution centre consisting of four 630 kVA transformers, which were replaced by four new 1000 KVA transformers.

With this improvement, quality supply was guaranteed for existing customers at the time and in the future.

These modifications made the existing low voltage configuration obsolete. To solve this, the plan was made for twenty-three new low voltage lines with 240 mm2 conductors along new ducting. These new lines fed low- and high-power commercial premises, as well as three residential blocks and a hotel.

These new infrastructures required works to ensure access to all the supplies involved in the planned actions.

Centrala

Ul. BOHDANA DOBRZANSKIEGO,          nr 3, lok, —, miejsc.
LUBLIN, kod 20-262, poczta LUBLIN, kraj POLSKA   Tl (+34 673 737 750) info@ecointegral.com

Film korporacyjny

Dokumentacja korporacyjna

 
Certyficaty

© 2018 Ecointegral Ingeniería S.L. Legal Terms

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.

3rd Party Cookies

This website uses Google Analytics to collect anonymous information such as the number of visitors to the site, and the most popular pages.

Keeping this cookie enabled helps us to improve our website.

Please enable Strictly Necessary Cookies first so that we can save your preferences!

Additional Cookies

This website uses the following additional cookies:

(List the cookies that you are using on the website here.)

Please enable Strictly Necessary Cookies first so that we can save your preferences!

Cookie Policy

More information about our Cookie Policy